Mechanical - Blocka Construction Inc https://blockainc.com General Engineering Contractors Tue, 19 May 2020 19:56:54 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 https://i0.wp.com/blockainc.com/wp-content/uploads/2020/05/favicon.png?fit=32%2C32&ssl=1 Mechanical - Blocka Construction Inc https://blockainc.com 32 32 21141146 New Main Office https://blockainc.com/2020/05/19/new-main-office/ Tue, 19 May 2020 19:55:32 +0000 http://blockainc.com/?p=2874 Various points during the construction of our new Pleasanton office.  

The post New Main Office first appeared on Blocka Construction Inc.

]]>
Various points during the construction of our new Pleasanton office.

 

The post New Main Office first appeared on Blocka Construction Inc.

]]>
2874
EBMUD Rate Control Station Rehab https://blockainc.com/2016/11/14/ebmud-rate-control-station-rehab/ Mon, 14 Nov 2016 16:06:47 +0000 http://blockainc.com/?p=968 BCI recently completed a project for EBMUD that involved rehabilitating electrical and mechanical components at 2 rate control station locations. Below are some pictures depicting the installation of a 24″ ball valve, as well as electrical upgrades. Replacement of the … Continue reading

The post EBMUD Rate Control Station Rehab first appeared on Blocka Construction Inc.

]]>
BCI recently completed a project for EBMUD that involved rehabilitating electrical and mechanical components at 2 rate control station locations. Below are some pictures depicting the installation of a 24″ ball valve, as well as electrical upgrades. Replacement of the 24″ ball valve was completed during a short duration shutdown of the pipeline. 20160803_14032920160803_14261720160803_14320420160803_170134

The post EBMUD Rate Control Station Rehab first appeared on Blocka Construction Inc.

]]>
968
SJWPCP Digester Gas Compressor Project https://blockainc.com/2016/11/14/sjwpcp-digester-gas-compressor-project/ Mon, 14 Nov 2016 15:50:54 +0000 http://blockainc.com/?p=947 BCI recently installed HVAC systems to support the new Disgester Gas Compressors being installed at the San Jose Water Pollution Control Plant. Below are some pictures showing this installation work. 

The post SJWPCP Digester Gas Compressor Project first appeared on Blocka Construction Inc.

]]>
BCI recently installed HVAC systems to support the new Disgester Gas Compressors being installed at the San Jose Water Pollution Control Plant. Below are some pictures showing this installation work. 2016-08-17-img_1414 2016-08-17-img_14172016-07-15-img_7138 2016-07-15-img_7140

The post SJWPCP Digester Gas Compressor Project first appeared on Blocka Construction Inc.

]]>
947
BCI Featured in SMW Local 104 Fall Newsletter https://blockainc.com/2016/01/20/bci-featured-in-smw-local-104-fall-newsletter/ Wed, 20 Jan 2016 17:01:09 +0000 http://blockainc.com/?p=871 BCI is proud to announce that Sheetmetal Local 104 featured the Warm Springs BART Extension Project in their Fall 2015 newsletter. Please see link below for the article.

The post BCI Featured in SMW Local 104 Fall Newsletter first appeared on Blocka Construction Inc.

]]>
BCI is proud to announce that Sheetmetal Local 104 featured the Warm Springs BART Extension Project in their Fall 2015 newsletter. Please see link below for the article.

http://issuu.com/sheetmetal/docs/fall_2015_newsletter_smw_local_104?e=0/30560713

The post BCI Featured in SMW Local 104 Fall Newsletter first appeared on Blocka Construction Inc.

]]>
871
Emergency Ventilation Fans https://blockainc.com/2015/08/13/emergency-ventilation-fans/ Thu, 13 Aug 2015 17:33:40 +0000 http://blockainc.com/?p=806 Installation Day for the Emergency Ventilation Fans for the BART Warm Springs Extension Project.  

The post Emergency Ventilation Fans first appeared on Blocka Construction Inc.

]]>
Installation Day for the Emergency Ventilation Fans for the BART Warm Springs Extension Project.20150612_07324120150612_093301 20150612_094611

 

The post Emergency Ventilation Fans first appeared on Blocka Construction Inc.

]]>
806
Warm Springs tunnel ventilation https://blockainc.com/2015/02/20/warm-springs-tunnel-ventilation/ Fri, 20 Feb 2015 20:59:53 +0000 http://blockainc.com/?p=756 The BART Warm Springs Extension project features 2 ventilation structures that provide tunnel ventilation for the BART ROW underneath Lake Elizabeth in Fremont. Below is a photo from one of the ventilation structures featuring 2 parallel sections of 14′ x … Continue reading

The post Warm Springs tunnel ventilation first appeared on Blocka Construction Inc.

]]>
The BART Warm Springs Extension project features 2 ventilation structures that provide tunnel ventilation for the BART ROW underneath Lake Elizabeth in Fremont. Below is a photo from one of the ventilation structures featuring 2 parallel sections of 14′ x 14′ ventilation ductwork currently being installed.

IMG_1060

The post Warm Springs tunnel ventilation first appeared on Blocka Construction Inc.

]]>
756
VTA Milpitas / Barryessa Extension Update https://blockainc.com/2015/02/20/vta-milpitas-barryessa-extension-update/ Fri, 20 Feb 2015 16:46:02 +0000 http://blockainc.com/?p=747 Aerial photos of the latest work at the Milpitas Station.

The post VTA Milpitas / Barryessa Extension Update first appeared on Blocka Construction Inc.

]]>
Aerial photos of the latest work at the Milpitas Station.

DCIM100MEDIA DCIM100MEDIA

The post VTA Milpitas / Barryessa Extension Update first appeared on Blocka Construction Inc.

]]>
747
SFPUC San Antonio Pipeline Project https://blockainc.com/2013/04/11/sfpuc-san-antonio-pipeline-project/ Thu, 11 Apr 2013 23:22:55 +0000 http://blockainc.com/?p=631 Preliminary construction activities are underway on the SFPUC San Antonio Pipeline Project, which includes installation 6,600′ of 66″ welded steel pipeline, control structures, chemical facilities, discharge structures, and other various facilities. BCI’s scope of work includes electrical, instrumentation, and control … Continue reading

The post SFPUC San Antonio Pipeline Project first appeared on Blocka Construction Inc.

]]>
Preliminary construction activities are underway on the SFPUC San Antonio Pipeline Project, which includes installation 6,600′ of 66″ welded steel pipeline, control structures, chemical facilities, discharge structures, and other various facilities. BCI’s scope of work includes electrical, instrumentation, and control systems, as well as building HVAC systems to support the pipeline work. This project will be complete in late 2014.

The post SFPUC San Antonio Pipeline Project first appeared on Blocka Construction Inc.

]]>
631
MUNI Integrated Systems Replacement Project https://blockainc.com/2013/01/16/muni-integrated-systems-replacement-project/ Wed, 16 Jan 2013 02:13:59 +0000 http://blockainc.com/?p=620 On January 15th, SFMTA Board of Directors approved a recommendation to award the MUNI Integrated Systems Replacement Project to BCI. The scope of this project includes  replacing and installing the Subway Public Address/Platform Display System (PA/PDS), the Subway Facility SCADA system, … Continue reading

The post MUNI Integrated Systems Replacement Project first appeared on Blocka Construction Inc.

]]>
On January 15th, SFMTA Board of Directors approved a recommendation to award the MUNI Integrated Systems Replacement Project to BCI. The scope of this project includes  replacing and installing the Subway Public Address/Platform Display System (PA/PDS), the Subway Facility SCADA system, the Motive Power SCADA System, installing a new Subway Fiber Broadband Network (FBN) System, new Uninterruptible Power Supply (UPS) Systems, and upgraded HVAC systems. This project is expected to be complete by August of 2014.

Castro Muni Station

The post MUNI Integrated Systems Replacement Project first appeared on Blocka Construction Inc.

]]>
620
BART Warm Springs Extension https://blockainc.com/2011/12/22/bart-warm-springs-extension/ Thu, 22 Dec 2011 21:36:16 +0000 http://blockainc.com/?p=414 BCI is partnered with Warm Springs Constructors for the HVAC portion of this project, which will add 5.4-miles of new tracks from the existing Fremont Station south to a new station in the Warm Springs district of the City of … Continue reading

The post BART Warm Springs Extension first appeared on Blocka Construction Inc.

]]>
BCI is partnered with Warm Springs Constructors for the HVAC portion of this project, which will add 5.4-miles of new tracks from the existing Fremont Station south to a new station in the Warm Springs district of the City of Fremont.

The Warm Springs Station will feature an at-grade island platform with an overhead concourse, intermodal access to Valley Transit Authority (VTA) and Alameda-Contra Costa Transit (AC Transit) buses, as well as taxi and “kiss and ride” passenger drop off areas, all via Warm Springs Boulevard.

BCI’s scope of work (approximately $9,000,000 in value) includes 350HP tunnel ventilation fans, Warm Springs Station plumbing and ventilation systems,  as well as plumbing and ventilation systems for various support facilities such as the Supervisor’s Building, Traction Power Substation, Ancillary Building, Fremont Station Fire Command Post, Ventliation structures, and Paseo Padre bathrooms. This project is expected to be completed and ready for revenue service in 2015.

The post BART Warm Springs Extension first appeared on Blocka Construction Inc.

]]>
414