Electrical - Blocka Construction Inc https://blockainc.com General Engineering Contractors Tue, 19 May 2020 19:56:54 +0000 en-US hourly 1 https://wordpress.org/?v=6.8.1 https://i0.wp.com/blockainc.com/wp-content/uploads/2020/05/favicon.png?fit=32%2C32&ssl=1 Electrical - Blocka Construction Inc https://blockainc.com 32 32 21141146 New Main Office https://blockainc.com/2020/05/19/new-main-office/ Tue, 19 May 2020 19:55:32 +0000 http://blockainc.com/?p=2874 Various points during the construction of our new Pleasanton office.  

The post New Main Office first appeared on Blocka Construction Inc.

]]>
Various points during the construction of our new Pleasanton office.

 

The post New Main Office first appeared on Blocka Construction Inc.

]]>
2874
SFPUC Southeast WPCP Disinfection Upgrades https://blockainc.com/2016/11/14/sfpuc-southeast-wpcp-disinfection-upgrades/ Mon, 14 Nov 2016 16:26:58 +0000 http://blockainc.com/?p=981 Below are photos depicting the installation of conduits under the building slab for the new electrical and control building.

The post SFPUC Southeast WPCP Disinfection Upgrades first appeared on Blocka Construction Inc.

]]>
Below are photos depicting the installation of conduits under the building slab for the new electrical and control building.

023019

The post SFPUC Southeast WPCP Disinfection Upgrades first appeared on Blocka Construction Inc.

]]>
981
BART Substation RRY Project https://blockainc.com/2016/11/14/bart-substation-rry-project/ Mon, 14 Nov 2016 16:17:04 +0000 http://blockainc.com/?p=975 Work is progressing at the BART Richmond Yard Substation Replacement Project. Work includes installation of district furnished DC Switchgear and Transformer on top of a new poured in place cable vault at at existing active maintenance yard. The picture below … Continue reading

The post BART Substation RRY Project first appeared on Blocka Construction Inc.

]]>
Work is progressing at the BART Richmond Yard Substation Replacement Project. Work includes installation of district furnished DC Switchgear and Transformer on top of a new poured in place cable vault at at existing active maintenance yard. The picture below shows the close proximity of the work in relation to the existing equipment, as well as the trains and active tracks.20160112_07222920160112_110346

20160819_143426

The post BART Substation RRY Project first appeared on Blocka Construction Inc.

]]>
975
EBMUD Rate Control Station Rehab https://blockainc.com/2016/11/14/ebmud-rate-control-station-rehab/ Mon, 14 Nov 2016 16:06:47 +0000 http://blockainc.com/?p=968 BCI recently completed a project for EBMUD that involved rehabilitating electrical and mechanical components at 2 rate control station locations. Below are some pictures depicting the installation of a 24″ ball valve, as well as electrical upgrades. Replacement of the … Continue reading

The post EBMUD Rate Control Station Rehab first appeared on Blocka Construction Inc.

]]>
BCI recently completed a project for EBMUD that involved rehabilitating electrical and mechanical components at 2 rate control station locations. Below are some pictures depicting the installation of a 24″ ball valve, as well as electrical upgrades. Replacement of the 24″ ball valve was completed during a short duration shutdown of the pipeline. 20160803_14032920160803_14261720160803_14320420160803_170134

The post EBMUD Rate Control Station Rehab first appeared on Blocka Construction Inc.

]]>
968
Gilroy WWTP Preanoxic Basin Project https://blockainc.com/2016/11/14/gilroy-wwtp-preanoxic-basin-project/ Mon, 14 Nov 2016 16:00:29 +0000 http://blockainc.com/?p=964 Work is nearing completion at the WWTP upgrade project in Gilroy, CA. The picture below depicts some of the installation work for a new 21kv Substation to power the new MCC’s, Oxidation Ditch 200HP Blowers, and Distribution Panels.

The post Gilroy WWTP Preanoxic Basin Project first appeared on Blocka Construction Inc.

]]>
Work is nearing completion at the WWTP upgrade project in Gilroy, CA. The picture below depicts some of the installation work for a new 21kv Substation to power the new MCC’s, Oxidation Ditch 200HP Blowers, and Distribution Panels.

20160127_125643

The post Gilroy WWTP Preanoxic Basin Project first appeared on Blocka Construction Inc.

]]>
964
SFPUC Groundwater Supply Well Stations https://blockainc.com/2016/11/14/sfpuc-groundwater-supply-well-stations/ Mon, 14 Nov 2016 15:56:33 +0000 http://blockainc.com/?p=954 Work is continuing at the (5) Groundwater Well Sites in San Francisco. Below are progress pictures depicting work at some of the locations.

The post SFPUC Groundwater Supply Well Stations first appeared on Blocka Construction Inc.

]]>
Work is continuing at the (5) Groundwater Well Sites in San Francisco. Below are progress pictures depicting work at some of the locations.

20160615_080428 20160615_08045020160322_10110020160831_11291320160914_11393320160502_13571720160914_105949

The post SFPUC Groundwater Supply Well Stations first appeared on Blocka Construction Inc.

]]>
954
BART Transformer Replacement Projects https://blockainc.com/2016/11/14/bart-power-transformer-replacement/ Mon, 14 Nov 2016 15:40:51 +0000 http://blockainc.com/?p=934 BCI recently completed the removal, replacement, and relocation work for (12) 34.5kv transformers throughout BART system. Below are pictures showing some of the installation work and tight working spaces. Work had to be coordinated closely with BART to prevent shutting down … Continue reading

The post BART Transformer Replacement Projects first appeared on Blocka Construction Inc.

]]>
BCI recently completed the removal, replacement, and relocation work for (12) 34.5kv transformers throughout BART system. Below are pictures showing some of the installation work and tight working spaces. Work had to be coordinated closely with BART to prevent shutting down any active BART systems. Operating system delays carry liquidated damages that top $35,000 per hour! 20150910_07252720150910_07253920151120_07071220151201_113729

dscn0530dscn0533dscn0536

The post BART Transformer Replacement Projects first appeared on Blocka Construction Inc.

]]>
934
Folsom Dam Project Update https://blockainc.com/2016/11/14/folsom-dam-project-update/ Mon, 14 Nov 2016 15:32:32 +0000 http://blockainc.com/?p=929 Progress pictures from Folsom Dam project. Conduits along the spillway have been installed and this fourth phase of the project is nearing completion.

The post Folsom Dam Project Update first appeared on Blocka Construction Inc.

]]>
Progress pictures from Folsom Dam project. Conduits along the spillway have been installed and this fourth phase of the project is nearing completion.img_1036capture

The post Folsom Dam Project Update first appeared on Blocka Construction Inc.

]]>
929
San Jose Water Company – Vickery Tank Project https://blockainc.com/2016/11/14/san-jose-water-company-vickery-tank-project/ Mon, 14 Nov 2016 15:27:03 +0000 http://blockainc.com/?p=925 Progress picture from the Vickery Tank Project.  Work consists of constructing 2 prestressed concrete tanks totaling 7.8 MG of storage capacity. BCI’s scope includes electrical and instrumentation work.

The post San Jose Water Company – Vickery Tank Project first appeared on Blocka Construction Inc.

]]>
Progress picture from the Vickery Tank Project.  Work consists of constructing 2 prestressed concrete tanks totaling 7.8 MG of storage capacity. BCI’s scope includes electrical and instrumentation work.
20151023_103720

The post San Jose Water Company – Vickery Tank Project first appeared on Blocka Construction Inc.

]]>
925
Rinconada WTP Residuals Management Project https://blockainc.com/2015/08/10/rinconada-wtp-residuals-management-project/ Mon, 10 Aug 2015 18:44:16 +0000 http://blockainc.com/?p=801 Below are some updated progress pictures of the Centrifuge Building, Gravity Thickeners, and Solids Loadout area. Also shown is the 12kV substation BCI installed to support these new facilities. Work is expected to be complete in late 2015.    

The post Rinconada WTP Residuals Management Project first appeared on Blocka Construction Inc.

]]>
Below are some updated progress pictures of the Centrifuge Building, Gravity Thickeners, and Solids Loadout area. Also shown is the 12kV substation BCI installed to support these new facilities. Work is expected to be complete in late 2015.

20150722_104549

 

20150722_104553

 

The post Rinconada WTP Residuals Management Project first appeared on Blocka Construction Inc.

]]>
801